Well i am actually about a week into the project as of 11/27/10 so I'll give everyone a rundown of whats been happening with my new tank.
So i recieved my new tank about 4 weeks ago and drilled the back to run a canister filter under the tank and have the return going to the top left corner for a waterfall.
heres a picture
and this is the picture of thank after being drilled
I then started Building the false floor and Background frame out of egg crate... while also getting bulkheads put in glues and ready to go on the back half of the tank where the canister filter tubing will be ran to.
from inside, and you can start to see where the water fall area will be.. I'm kinda getting a lot of insperation from Zach2011's waterfall (if you haven't check out his its awesome)

and this after i have fitted(not glued) the plumbing to the water fall area a lot more clear now..
I made the water area that will be mostly all gravel except for about an inch and a half of water showing...

another from the top of the tank...

I've also been working on a false log that i plan on putting a hole and pvc pipe through for a hideaway for the Crestie! It's name is Erie

And here is Erie!!! he's kinda shy but i got this pic of him (lucky shot)
well thats all for now, but I'm constantly working on it so I'm on every five minutes looking at others tanks for more ideas! hit me up with questions and input still new so I would love some expert advice! for now its bed time I'm tired